Shanghai Electric Secures First Overseas Heavy-Duty Gas Turbine Order for 500 MW Malaysian Project

- Writer

Senin, 14 September 2026 - 00:00 WIB

facebook twitter whatsapp telegram line copy

URL berhasil dicopy

facebook icon twitter icon whatsapp icon telegram icon line icon copy

URL berhasil dicopy

SHANGHAI, Sept. 14, 2026 /PRNewswire/ — Shanghai Electric (SEHK: 02727, SSE: 601727) has achieved a milestone in the high-end overseas energy sector by securing the contract for Unit 3 of the Sarawak Samalaju Combined Cycle Gas Turbine (CCGT) Project in Malaysia. The win represents significant international recognition of Shanghai Electric’s heavy-duty gas turbine technology, underscoring the company’s growing competitiveness in the global gas turbine market.


Under the agreement, Shanghai Electric will deliver a full EPC turnkey solution for the gas-fired power plant, coupled with a 25-year long-term service agreement (LTSA) covering all major equipment. Notably, every core component—from gas turbines and steam turbines to generators, heat recovery steam generators, and air-cooled systems—will be manufactured in-house by Shanghai Electric, which will also serve as the sole provider of the long-term maintenance and service program. This integrated, end-to-end capability gives Shanghai Electric full life-cycle coverage, spanning equipment manufacturing, systems integration, and multi-decade operational support—a vertical model that brings the company on par with the established global leaders in the heavy-duty gas turbine sector.

Shanghai Electric’s current heavy-duty gas turbine lineup features two principal models, with output ratings of 300 MW and 78 MW, respectively. To date, the company has delivered 103 units, with total installed capacity from commissioned projects exceeding 21,000 MW. The units covered by Shanghai Electric’s long-term service and maintenance programs have accumulated more than 1.3 million operating hours. With robust production capacity available across both turbine classes, Shanghai Electric is positioned to offer new units for delivery as early as 2028. Beyond the Malaysian energy developer that awarded the current contract, project developers in Indonesia, Thailand, the Philippines, and Vietnam have also expressed strong interest in placing orders.

Berita Terkait

Malaysia’s AI growth must be green, intelligent and focused on real-world applications – Fahmi
Asian Captive Conference 2026 Highlights How Captives Are Utilised as Businesses Navigate Risks
CyberDSA 2026 Draws Global Cyber Leaders for High-Level Talks on AI, Digital Trust and Critical Infrastructure
AiMOGA Debuts Intelligent Security Robot and Robotic Nurse Overseas at IFA 2026, Signalling Robotics Ambitions for Malaysia
After a Long Year, Malaysians Are Looking for More Ways to Get Away, Agoda Finds
Malaysia Ranks Second in ASEAN Digital Nations Index as GSMA Calls for Region to Turn Digital Ambition into Integrated Action
SMU and LSE say universities and global academic culture should prioritise purpose and people
ZTE Global Summit & User Congress 2026 Opens in Kuala Lumpur, Advancing from Connectivity to Digital Value Creation

Berita Terkait

Senin, 14 September 2026 - 00:00 WIB

Shanghai Electric Secures First Overseas Heavy-Duty Gas Turbine Order for 500 MW Malaysian Project

Jumat, 11 September 2026 - 12:18 WIB

Malaysia’s AI growth must be green, intelligent and focused on real-world applications – Fahmi

Jumat, 11 September 2026 - 07:45 WIB

Asian Captive Conference 2026 Highlights How Captives Are Utilised as Businesses Navigate Risks

Jumat, 11 September 2026 - 05:17 WIB

AiMOGA Debuts Intelligent Security Robot and Robotic Nurse Overseas at IFA 2026, Signalling Robotics Ambitions for Malaysia

Jumat, 11 September 2026 - 02:27 WIB

After a Long Year, Malaysians Are Looking for More Ways to Get Away, Agoda Finds

Berita Terbaru